Capra Optimization Method for Solving the Economic Dispatch Problem with the Int
39,79 €
The annual growth of energy demand in India has increased significantly from 304.5 GW in 2016 to 329.6 GW in 2017 (MNRE 2017). As on 31-03-2017, the total installed capacity of electrical power generation in India is 329204.53 MW.
Jetzt bei Ebay: